Ferrier, Alberta


The Ferrier Gas Plant is a strategically located at LSD 01-06-41-07 W5M, which is approximately fifteen kilometres northwest of Rocky Mountain House, Alberta.


The Ferrier Gas Plant is a refrigerated lean oil absorption processing facility and receives sweet rich gas from local areas wells.

MIDSTREAM CONTACT
Ferrier, Alberta

The Ferrier Gas Plant is a strategically located at LSD 01-06-41-07 W5M, which is approximately fifteen kilometres northwest of Rocky Mountain House, Alberta.


The Ferrier Gas Plant is a refrigerated lean oil absorption processing facility and receives sweet rich gas from local areas wells.

MIDSTREAM CONTACT

Design Capacity

2,909 e 3 m 3 /d 400 m 3 /d 300 m 3 /d 250 m 3 /d SALES GAS PROPANE BUTANE CONDENSATE 2,909 e 3 m 3 /d 400 m 3 /d 300 m 3 /d 250 m 3 /d SALES GAS PROPANE BUTANE CONDENSATE

    The Ferrier Gas Plant has diverse
    midstream capabilities

    The Ferrier Gas Plant provides a wide range of important services for our customers in order to improve their netbacks in addition to processing sweet, natural gas. An on-site, lean oil fractionator provides cost effective, ngl fractionation into spec propane (C3), butane (C4) and condensate (C5) allowing customers to sell higher value spec products, rather than having to truck mix to another facility.

    A D13 compliant, fully metered truck rack also allows us to help customers consolidate their non-pipeline connected products from other sites for fractionation and transportation with us. On the outlet of the plant, we produce and sell FXII, a value added, stabilized, hydrocarbon solvent used for swabbing wells to improve production rates.

    Our pipeline connected Lochearn rail and truck rack adds further value and improves customer netbacks by aggregating propane and butane volumes and selling them wholesale into larger markets and entities connected to rail as well as truck.

    Please give us a call at (403) 351-9548 or email us at Midstream to see how we can improve the profitability of your production.

Lochearn

The Lochearn Rail and Truck Loading Facility is located at 03-20-39-7W5, which is approximately fourteen kilometres from the Ferrier Gas Plant. The Lochearn Loading Facility receives and loads spec butane and propane product from the Ferrier Gas Plant. A load rack exists to offload product onto rail cars at a Canlin owned 16 car rail siding. In addition, an automated truck loading system is in place for sales to more local markets.

Mercaptan odorizer can be added to products as necessary.

Canlin Energy Corporation is a proud supported of the Canada Action.

Canlin Energy Corporation is a proud supporter of Canada Action.

Learn More

24HR EMERGENCY CONTACT # 1-866-409-2744

Ground Disturbance Activites Alberta utilitysafety.ca BC www.bc1c.ca
Copyright © 2018 - 2024 Canlin Energy Corporation - All Rights Reserved.